viernes, 1 de abril de 2011

Unidad 4 - Patrones de Organizacion de un Parrafo



Unidad 4 - Patrones de Organizacion de un Parrafo

 (Los Ejercicios de esta Unidad fueron realizados en Equipo Rosa Mendoza y Guido Di Francescantonio)
Ejercicio A (Marcadores de Definición)



Project Management

Project management is the discipline of planning, organizing, securing and managing resources to bring about the successful completion of specific project goals and objectives. It is sometimes conflated with program management, however technically that is actually a higher level construction: a group of related and somehow interdependent engineering projects.
A project is a temporary endeavor, having a defined beginning and end (usually constrained by date, but can be by funding or deliverables), undertaken to meet unique goals and objectives, usually to bring about beneficial change or added value. The temporary nature of projects stands in contrast to business as usual (or operations), which are repetitive, permanent or semi-permanent functional work to produce products or services. In practice, the management of these two systems is often found to be quite different, and as such requires the development of distinct technical skills and the adoption of separate management.
The primary challenge of project management is to achieve all of the project goals and objectives while honoring the preconceived project constraints.  Typical constraints are scope, time, and budget. The secondary—and more ambitious—challenge is to optimize the allocation and integration of inputs necessary to meet pre-defined objectives.


Idea General del Parrafo
   La gerencia de proyecto es la disciplina de planificar, organizar, y manejar los recursos para lograr los objetivos y metas especificas de un proyecto.
Marcadores de Definicion:  
  -   is the discipline of planning
   -   It is sometimes conflated with program management  
   -   is actually a higher level construction
   -   A project is a temporary endeavor
   -   as such requires the development
   -   is to achieve all of the project goals
   -   are scope, time, and budget  
   -   is to optimize the allocation

 Ejercicio B (Marcadores de Tiempo)

Project Management History



 Roman Soldiers Building a Fortress, Trajan's Column 113 ADProject management has been practiced since early civilization. Until 1900 civil engineering projects were generally managed by creative architects and engineers themselves, among those for example Vitruvius (1st century BC), Christopher Wren (1632–1723) , Thomas Telford (1757–1834) and Isambard Kingdom Brunel (1806–1859). It was in the 1950s that organizations started to systematically apply project management tools and techniques to complex engineering projects.

Henry Gantt (1861-1919), the father of planning and control techniques.As a discipline, Project Management developed from several fields of application including civil construction, engineering, and heavy defense activity. Two forefathers of project management are Henry Gantt, called the father of planning and control techniques, who is famous for his use of the Gantt chart as a project management tool; and Henri Fayol for his creation of the 5 management functions which form the foundation of the body of knowledge associated with project and program management. Both Gantt and Fayol were students of Frederick Winslow Taylor's theories of scientific management. His work is the forerunner to modern project management tools including work breakdown structure (WBS) and resource allocation.
The 1950s marked the beginning of the modern Project Management era where core engineering fields come together working as one. Project management became recognized as a distinct discipline arising from the management discipline with engineering model. In the United States, prior to the 1950s, projects were managed on an ad hoc basis using mostly Gantt Charts, and informal techniques and tools. At that time, two mathematical project-scheduling models were developed. The "Critical Path Method" (CPM) was developed as a joint venture between DuPont Corporation and Remington Rand Corporation for managing plant maintenance projects. And the "Program Evaluation and Review Technique" or PERT, was developed by Booz Allen Hamilton as part of the United States Navy's (in conjunction with the Lockheed Corporation) Polaris missile submarine program; These mathematical techniques quickly spread into many private enterprises.


Idea General del Parrafo
   Los inicios de la gerencia de proyecto
Marcadores de Tiempo: 

 -      Until 1900
 -      Early
 -     In the 1950s
 -      Started
 -      1st Century BC

 -      (1632-1723)
 -      (1757-1834)
 -      (1806-1859)


No hay comentarios:

Publicar un comentario